About West Covina
Agenda-Council Meeting
Agenda-Community Development Commission
Agendas-Commission Meetings
Budget 2004-2005
Budget 2005-2006
Budget 2005-2006 in Brief (PDF)
Business Licenses
Cable TV Program Schedule
CAFR 2005 (PDF)
City News and Discover
West Covina
Civic Leadership 2004
Community Notification
Community Phone Numbers
Customer Service Survey
Departments
Directions and Maps
Homeowners Permit
Meetings
Municipal Code
Jobs with the City
Parking Tickets
Passport Services
Phone Directory
Public Hearing Notice
Public Service Projects
Report a Violation
Traffic Committee Meeting
West Covina Courthouse
|
-Public Works - Alameda Corridor Project-
The Alameda Corridor - East (ACE) Project encompasses a distance of 35 miles of freight rail line through the San Gabriel Valley between East Los Angeles and Pomona.
This project connects the cargo containers from the ports of Los
Angeles and Long Beach to the transcontinental rail network.
Train traffic through the San Gabriel Valley is expected to increase
by 160 percent by the year 2020. The goal of ACE is to mitigate
the effects of increased traffic along the freight rail corridor
through the San Gabriel Valley from East Los Angeles to Pomona.
The ACE Project includes transportation safety improvement
projects at 42 rail crossings located throughout the San Gabriel Valley,
including a grade separation at the intersection of Nogales Street and
Valley Boulevard.
The grade separation at Nogales Street and Valley Boulevard will
require Nogales Street to be lowered approximately 20 feet under
the railroad tracks and Valley Boulevard. Two bridges will be built to
carry both railroad traffic and Valley Boulevard motorist traffic over
the depressed Nogales Street. Alameda Corridor - East Project to Help Mitigate Traffic.
The newly configured Nogales Street will also include a loop connector
road that will replace the normal intersection at Nogales and Valley and will be located in the northeast quadrant of the intersection.
Site preparation began in October 2002, with construction of the
grade separation beginning in November 2002. Construction will require
the full street closure of both Valley Boulevard and Nogales
Street at the intersection.
A temporary detour will be paved on the east side of Nogales and north side of Valley to carry vehicular traffic around the construction. This will allow local traffic to be maintained through the area during the construction.
Construction is anticipated to be completed by spring 2005.
Detour signs will be posted along Nogales Street and Valley Boulevard. Motorists may still experience delays traveling on Nogales Street and Valley Boulevard.
For more information, call the Project Helpline at (888) ACE-1426 or visit the Alameda Corridor East Construction Authority web site at http://www.theaceproject.org/westcovina.htm
Additional signage is provided via download in Acrobat format:
- back to top -
Community Events |
Visit City Hall |
Meet Your City Council
Kids Stuff |
West Covina Loves Your Business |
Home
Phone Directory |
Site Map |
Contact Us
|